Thursday, November 6, 2008

Street Dept Weekly DHR 11/6/08

STREET DEPARTMENT REPORT - 11/10/08



Department: Street Department



Date: Oct. 31-Nov. 6, 2008



Prepared by Oscar Hoskins and Earnest Womack



Specific Weekly Activities:



Mowed & cut:


10/31


  • Quarles Ln ditch and shoulder
  • East and West side shop

11/3


  • Corner of College & McDonough
  • Corner of Columbia & Walker
  • Walker & Holly
  • Bonanza St ditch from Panama to Washington
  • Corner of Washington & Panama
  • 200 block South Sam
  • Cleaned drainage ditch from Sam to Coanza and Coanza to Baringo

11/4


  • Working on drainage ditch from Baringo to So Washington
  • 2 lots 200 block So Washington

11/5


  • Cleaning drainage ditch from So Washington to Elm St

11/6


  • Working on completing drainage from Elm St to LR Rd


Mechanic:


10/31


  • Repaired 2 hoses on Street Unit 105 Knuckle Boom
  • Repaired 2 hoses on Street Unit 107 Knuckle Boom
  • Working on heater core module on Police unit 18

11/3


  • Finished work on heater core module on Police unit 18
  • Replaced air filter and lubricated Street unit 105 Knuckle Boom
  • Repaired Street unit 107 Knuckle Boom (boom stuck)

11/4


  • Repaired light on Sanitation unit 29
  • Working on Dozer trailer tire rim
  • Removed radiator from Bucket truck
  • Fixed lights on blue dump truck

11/5


  • Fixed flat on Street unit 103
  • Checked brakes on Street unit 31
  • Checked starter on fork lift
  • Assisted with computer recycling

11/6


  • Serviced Auto car dump truck
  • Replaced wheel hub plug Sanitation unit 26
  • Replaced hydraulic oil filter Street unit 105 Knuckle Boom
  • Replaced idle switch in Street unit 106 Knuckle Boom


Potholes:


11/6


  • Intersection Sioux & Seminole - 1
  • 200 block No 9th - 3
  • 100 So 9th - 2


Animal control:


  • Removed several dead animals from streets


Mosquito control:


Clark Mosquito Control serviced Mosquito rigs – 11/5/08


Mosquito control-No spraying done (units will be removed from vehicles)



Other activities:


Continuous removal of debris throughout city designated trash routes


Litter pick up at primary routes of City:


Rightor St


Walnut St.


Cherry St.


Porter St.


Perry St.


Elm St.


Franklin St.


Oakland Ave.


Quarles Lane


Plaza St



10/31


Completed work on drainage project Waverly Wood


11/1


Off loaded trash from Mississippi Queen Riverboat


Toured Delta Queen Riverboat


11/3


Hill & Hill completed Springdale Rd resurfacing

Billy Amos of Amos Electric began installing Christmas Lights


11/4


Repaired pothole in alleyway Cleburne & Sam


Working with ADEQ and East Arkansas Planning on electronic recycling project


Hauled 345 tires to Waste Disposal site


Womack installed direction sign to golf course on Hwy 49 and Airport Rd


11/5


Ordered storm drain cover for corner of No 7th and Plaza


Completed electronic recycling project


11/6


Cleaned up trash pile on East side lot


Replaced missing stop sign Walnut and Market


Replaced Do-Not-Enter sign Columbia and Walker


Replaced manhole cover 7th & Plaza


Traffic light technician repaired signal light at Hwy 49 and Exxon


Requested bids for street repair work on 2nd St-Housing Authority



Future Weekly Activities:


Drain at South 7th and South 8th


Washout at Beechwood east


Washout at 127 Valley Dr-marked for AR One call 11/6



Follow Up Activities:


Debris removal from Little Rock Rd and Elm St park


Debris removal from end of So Coanza


Code Enforcement identifying and notifying property owners of overgrown lots throughout City. City will not mow lots until Code Enforcement has communicated with owners.



Staff Concerns/Issues:


Henard Utility will conduct training on Leaf Vacuum with Street and Parks Departments on Wednesday, November 12, 2008.




STREET DEPARTMENT GASOLINE LOG






Week of 10/31-11/6/08








DATE


UNIT #


GALLONS


RECEIVER


10/31/2008


103


19


R Smith


11/3/2008


30


21


E Butler


11/3/2008


42 Sanitation


25.3


A Barry


11/3/2008


12 Sanitation


17


L Britton


11/4/2008


13


20


J Lemaire


11/5/2008


30


16


E Butler


11/5/2008


103


19.8


R Smith


11/5/2008


9


22.7


O Hoskins


11/6/2008


19


16


W Wilson


11/6/2008


42 Sanitation


35.3


A Barry











TOTAL GALLONS


212.1




No comments: