     Weekly Landfill Report 

   Department: Helena West Helena Regional Landfill

 Date: July 13, 2009

 Prepared By: Bob Gaston 
 

 Specific Weekly Activities: 

 Employees Tommy and Larry come in at 6:30am to start equipment and  do daily maintenance; Donna comes in at 7:00am and turns on computer.

 Once Larry has the working face and road ready he lets Donna start sending trucks down. Donna weighs the trucks and sends the trucks to the cell. Once the truck has emptied the driver returns and is weighed. Donna prints a ticket and the driver comes in and signs the ticket, the driver receives a copy. Each truck goes through this process each time. Donna also does random inspections on a daily basis. As the waste is placed in the cell the process of compacting begins. We start lunches at 10:00 am and go thru 12:00. After lunch we start placing dirt around the working face so we can cover. Trucks are allowed to enter landfill until 3:30pm. After the last truck is weighed out Donna begins adding tickets and balancing with the computer and printing reports.

 Donna is usually finished by 4:00pm. After the last truck leaves the operators finish compacting and covering. This normally takes about one and half hours. Each day someone checks the leachate pumps and tanks. We have part time help to take care of litter, grass, office, scales, and other task. We maintain a daily maintenance log on all equipment and make sure hourly maintenance is maintained.

We work during all weather conditions and wet weather adds to the over time. Most weather damage repair is done on Sat. 
 

 Future Activities: 

  1. Work on drainage.
  2. Build clean-out pad.
  3. Ordering sod to fill in bare spots on west slop.
  4. Building road for wet weather area
  5. Quarterly gas report.
  6. Employee certification.
  7. Start construction on clean out pad May 1, 2009.
  8. Cell expansion bids going out week of July 13, 2009.
  

 Activities Completed: 
 

  1. ADEQ inspection on June 11, 2009. Landfill received a score of three and deficiency is being corrected.
  2. Regular maintenance on Volvo and Dozers completed.
  3. Oil samples taken for analysis report.
  4. Weather road completed.
  5. Donna has passed her Class A certification.
  6. Tommy Amos is now a certified B operator.
  7. June tonnage was 3,026.85 tons.
  8. Manager has obtained a Solid Waste Master license, level C.

    Staff Concerns/ Issues;

    1. Larry is still on Workman Comp leave. 
     
     