STREET DEPARTMENT REPORT – 10/26/09
Department: Street Department
Date: October 16-22, 2009
Prepared by Oscar Hoskins and Earnest Womack
Specific Weekly Activities:
Mechanic: 10/16 Repaired lights on Sanitation 21 Replaced thermostat Police 16 Welded packer cylinder Sanitation 21 Took Sanitation 26 to Mayville for cylinder repair Repaired brake lights brown Dodge van 10/19 Repaired hood latch Police 21 Worked on door latch Sanitation 29 Changed blower motor Street 30 Replaced thermostat and changed oil Police 17 Changed oil Police 20, 16, 18, 11, & 21 Installed rebuilt radiator in Auto car Checked brakes on P & R red GMC Replaced hydraulic hose Sanitation 29 10/20 Replaced brake master cylinder on P & R red GMC Finished installing radiator on Auto car Repaired door on Street 106 Worked on Sanitation 26 wiring Replaced belts on Auto car Repaired rear flat tire on Animal Control truck 10/21 Worked on Sanitation 29 brakes Changed oil Police 1 Installed water pump on Auto car Worked on knuckle boom 107 tail lights Repaired Sanitation 26 signal lights Replaced oil sending unit Sanitation 29 Changed oil Police 3 10/22 Changed oil Police 19 Put transmission fluid in red Ford Police van Worked on back door pin Sanitation 29 Replaced hose knuckle boom 105 Potholes: 100 block Short Mobile-10 100 block Panama Rd-1 200 block Missouri-2 200 block Coanza-2 100 block Stonebrook-1 No 7th & Anderson-3 700 block 100 block 1100 block Wangle-6 1000 block Columbia-1 400 block No 2nd-2 300 block Russ-1 Mississippi & Plaza-2 Animal control: Picked up numerous dead animals from street Picked up 3 animal from vet Assisted homeowner with dog in basement at 500 block Other activities: Continuous removal of debris throughout city designated trash routes Litter pick up at primary routes of City: Rightor St Walnut St.30 Cherry St. Elm St. Plaza St 10/16 2 vehicle entries in CHS Homecoming Parade Took saw and portable air compressor to Small Engine Repair 10/19 Working on drainage ditch Womack assisted with installation of radiator in Auto car 10/20 Continued digging at Located end of culvert at Surveyed Miller Loop site for drainage flow Picked up air compressor from Small Engine Repair Cut & mowed: Oak St Aaron St-3 lots 10/21 Started moving Admin Office from West to East side offices Removing ruts from camp ground at Cut up five fallen trees under Boardwalk and smooth out ruts Cut & mowed: Holly & Walker St-1 lot Started mowing 10/22 Replaced sign Paradise Cove and cleared limbs obstructing view Repaired pothole at McDonough and College with rock Spoke with contractor remodeling house on Assisted P & R at Washington St Park moving peat gravel for new swing area Hoskins, Womack, McGinister, East Water Dept, and Jordan surveyed shoulder of possible wash out (tree on hillside is pulling from hill and shifting soil) Follow Up Activities: Hackberry overgrowth Cleaned curbing in Repair culvert at intersection of Valley Dr & Oakland Repair loop at
Staff Concerns/Issues: John Lemaire's work status (full/part-time)
|
We write about issues impacting the quality of life of our readers. Empowering you is our mission. If what we say here helps one person, then our blogging is not in vain.
Friday, October 23, 2009
Street DHR 10-26-09
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment