Friday, November 6, 2009

Street DHR 11/9/09

                         STREET DEPARTMENT REPORT – 11/9/09

 

Department: Street Department

 

Date: October 30-November 5, 2009

 

Prepared by Oscar Hoskins and Earnest Womack

 

Specific Weekly Activities:

 

Mechanic:

10/30

Cleaned shop

Replaced relays and tightened arm-Sanitation 27

Replaced hydraulic hose and tightened arm-Sanitation 25

Installed new hydraulic pump and hose blue and white dump truck

11/2

Replaced hydraulic pump-Sanitation 28

Trouble shooting Sanitation 28-arm will not lift

Went to Washington Park to pull P & R vehicle from soft ground

11/3

Cleaned shop

Replaced leaking fuel line-Street 107 knuckle boom

Checked Sanitation 30-arm will not lift

Replaced pin in boom Street 107 knuckle boom

Fixed hopper light-Sanitation 29

Tightened hydraulic cylinder on arm and tightened fender-Sanitation 29

Welded finger on arm-Sanitation 25

Took Sanitation 30 to machine shop-broken rod on lift arm

11/4

Replaced hydraulic line-Sanitation 25

Serviced and filled Sanitation 24 with diesel

Replaced accelerator rod on Auto car

Boosted white Suburban

Worked on Street 106-engine shutting off (damaged radiator)

Took Street 106 radiator to Holland Radiator for repair

Fixed bent rim and aired tires on red Police van

Charged battery on fork lift

11/5

Changed oil in Col. Fielder's white Impala

Cleaned battery terminals and cable ends-Street 103

Greased arm-Sanitation 28

Serviced blue & white and red & white dump truck

Cleaned and serviced dozer and returned to Brown's Equipment Rental

Potholes:

400 block Joyner Dr-6

Filled street cut 800 block Pecan St with white rock

100 block East Garland-1

200 block East Garland-6

100 block Mississippi St-5

300 block Russ-1

300 block Dinan-1

400 block No 10th-1

Christopher Homes-3

100 block Coanza-5

1000 block Pecan-2

600 block Beech-filled pothole with white rock

 

Animal control:

Picked up numerous dead animals from street

Picked up 3 animal from vet

 

Other activities:

Continuous removal of debris throughout city designated trash routes

Litter pick up at primary routes of City:

Rightor St

Walnut St

Cherry St

Porter St

Perry St

Elm St

Franklin St

Oakland Ave

Quarles Lane

Plaza St

Phillips St

 

10/30

Amos Electric started on Christmas decoration displays

Cut up fallen tree-800 block Franklin

Checked drain flow-No 6th, No 7th, No 5th with assistance of Mayor Valley & Ken Weiland

Cut up fallen tree-Columbia at McDonough

Cut up fallen tree-Old Little Rock Rd near Oak Grove Cemetery #1

Blew out culverts-812 Walker

Replaced green traffic light-Columbia at Perry

Cleared drains:

Frank Frost-2

Pecan at Porter-1

700 block Columbia-1

600 block Porter-1

800 block Rightor-1

11/2

Blew out drain 300 block Franklin

Checked drains-7th and Plaza

Blew drains out with assistance of Fire Dept at 7th St between Garland & Baldwin

Checked on fallen tree-Bonanza & Baringo (Owner will contact Disaster Relief)

Cleared alley between So 8th and 7th St

Cleaned curbing: Ohio, Market, Miller, and Cherry (all north end)

11/3

Womack went to West Memphis to pick up electrical part for Sanitation 28

Set poles for directional arrows for Oak Grove and Odd Fellows Cemetery

Cleared debris from old Coca-Cola building

Cut both ditches on Westwood off Hwy 49

Cut ditch and picked up paper in front of Mt. Tabor MBC

Cleaned curbing-Pecan, Market, Miller, McDonough, Franklin, Perry, and Columbia (all north end)

11/4

Brickeys inmates clearing intersection of Center & Old Little Rock Rd behind TIC

Womack and Clark took Sanitation 26 to Scruggs for service

Moved auto lift to East side shop

Cleaned ditch from Mixed Breed Auto Repair to Baringo St

Cut ditch at corner of Anderson & Center

Cut Oak Grove Cemetery #2 & 3

Cleaned curbing: Beech & Market, Beech & Miller, Poplar & Market, Poplar & Miller, 1100 & 1200 blocks Poplar, Arkansas St in front of old fire station, and 500 & 600 blocks Arkansas

11/5

Womack and Clark took Sanitation 24 to Scruggs for service

Moved old oxygen cylinders from old Coca-Cola bldg

Cleaned dozer for return to Browns Equipment Rental

Installed directional signs at intersection of Park and Ashlar for one-way traffic at West Side School

Put sand on oil spill on Adams Hill

 

Follow Up Activities:

127 Valley Dr

Hackberry overgrowth

Cleaned curbing in North Helena (Started 11/2)

Repair culvert at intersection of Valley Dr & Oakland

Repair loop at Oakland and Valley Dr, Hwy 242 and Hwy 49, Hwy 49 & Hwy 49B

Ditch in Lincoln Ct off Mississippi St behind DeSquare residence

 

Staff Concerns/Issues:

All part-time employees laid off-11/4

 

STREET DEPARTMENT GASOLINE LOG

 

 

 

 

Oct. 30-Nov. 5, 2009

 

 

 

 

 

DATE

UNIT #

GALLONS

RECEIVER

10/30/2009

34

13

H Robinson

10/30/2009

Tundra

23.9

L Driver

11/2/2009

19 Dodge Ram

30.7

A Stewart

11/2/2009

19 Dually

35.6

R Williams

11/3/2009

103

19

R Smith

11/3/2009

34

12.3

H Robinson

11/3/2009

Box Shop

25.3

M Holbrook

11/3/2009

13

18.7

L Driver

11/4/2009

30

22.8

E Butler

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TOTAL GALLONS

201.3