![]() | ![]() | ||||||
Word of the Day for Saturday, May 23, 2009equanimity \ee-kwuh-NIM-uh-tee; ek-wuh-\, noun: Evenness of mind; calmness; composure; as, "to bear misfortunes with equanimity." For one whose mind has been notoriously troubled, Brian Lara is at least retaining a sense of equanimity. When one is happy, one can look at both comedy and tragedy with equanimity. I think one person can hardly understand why another has conducted his life in such a way, how he came to commit certain actions and not others, whether he looks upon the past with mostly pleasure or equanimity or regret. Equanimity comes from Latin aequanimitas, "impartiality, calmness," from aequanimus, "impartial, even-tempered," from aequus, "even" + animus, "mind, soul." | |||||||
Follow Dictionary.com on Twitter. | |||||||
| |||||||
We write about issues impacting the quality of life of our readers. Empowering you is our mission. If what we say here helps one person, then our blogging is not in vain.
Saturday, May 23, 2009
equanimity: Dictionary.com Word of the Day
Friday, May 22, 2009
Street Dept report 5/15-21/09
STREET DEPARTMENT REPORT – Department: Street Department Date: Prepared by Oscar Hoskins and Earnest Womack Specific Weekly Activities: Mechanic: 5/15 Worked on door Sanitation unit 21 Changed oil in Dist. Court Explorer Serviced track hoe Took auto cart truck to Mayville & Son 5/18 Changed plugs in Police unit 21 Plugged tire and changed oil in Police unit 13 Assisted welder with arm on Sanitation unit 25 Removed thermostat from Sanitation unit 29 (ordered by Mayville & Son) 5/19 Replaced heater hose in Police unit 4 Replaced hydraulic hose on John Deere 5310 Removed blower motor Police unit 21 Changed oil in Park & Rec 4-wheeler Received thermostat for Sanitation unit 29 from Mayville & Son 5/20 Installed blower motor in Police unit 21 Assisted with trash pickup Assisted with replacing traffic signal lights Installing thermostat in sanitation unit 29 (incompatible thermostat) 5/21 Assisted with back hoe work at Little Rock Rd Park Replaced hydraulic hose in Sanitation unit 25 Working on Sanitation unit 22 Hooked up auto car to trailer for debris removal at 1108 Porter Installed glad hand on auto car air hookup Put battery, compressor and AC dryer on Police unit 16 Went to Potholes: 100 block Don St-4 100 block Neill Rd-3 100 block Military Rd-3 100 block Tulip Circle-2 400 block Miller St-2 1000 block College-3 200 block Joe Brady-6 Alley-Columbia & Beech-3 Animal control: Removed numerous dead animals from streets Picked up three dead animals from vet Euthanized bleeding pit bull that was chasing residents on Other activities: Continuous removal of debris throughout city designated trash routes Litter pick up at primary routes of City: Rightor St Walnut St. Cherry St. Elm St. Plaza St 5/15 Mowed: East & West center greens Corner lot Poplar & Porter No & So ridge Unstopped drain corner of Perry & Pecan Unstopped drain corner of Franklin & Elm 5/18 Removed pipe from ditch on So Baringo Cleaned out drains at Ridgemont at Bernice and Grider Mowed: Rifle range Helena Fish Market Caney Creek East side shoulders 5/19 Finished drainage project on Old Dominion Ordered pipe for Baringo drainage project Assisted with Sanitation trash route Mowed: Shoulders at 4th & Ladino & Coanza Park & DeSoto 3 lots on So Coanza 5/20 Placed AR One call for Replaced street signs Red Bud Cove and Straightened stop sign Baringo at Bonanza Replaced 4 traffic signal lights-Sebastian at Anderson-1, 5/21 Assisted with Old Little Rock Rd Park cleanup Cleaned ditch on Checked signal lights at Event sprayed Mowed shoulders: College & McDonough Walker Hill No Franklin & Pecan Madison & Pecan Military Rd Adam Hill Future Weekly Activities: Washout on Ditch at Follow Up Activities: Cover ditch Ladino and Baringo Sidewalk-100 block Coanza (met with engineer-Ken Weiland) Staff Concerns/Issues: Telephones for Street and Sanitation offices (multiple lines)
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
DHR Parks and Recreation
Weekly Report
Department: Parks and Recreation
Date: 5-25-09
Prepared by: B. O'Shea Burrell
Specific Weekly Activities
5-18-09
Monday
Cleaned Malco
Daily cleaning of the HWHCC
Adult free play basketball
Cut Washington St. Park
Diabetic Shoppe
Tuesday 5-19-09
Daily cleaning @ HWHCC
Cut 10th St. Park
Wednesday 5-20-09
Volleyball 7:45pm- until close
Daily cleaning @HWHCC
Re -cut Washington St. Park
R&J Graduation @the Malco
Cleaned Malco
Thursday 5-21-09
Prepared field for soft ball game
Cut grass At Helena Park
Children's softball practice held at N. Helena Park
Adult Softball Games 6pm-9pm
Movie shown @the Malco
Friday 5-22-09
Daily Cleaning @HWHCC
Graduation Party 8- until
Closed at noon for holiday, return on Tuesday May 26th
Future Activities
- Check fire extinguisher every month and Initial after inspection.
Fire extinguisher need to be replaced in light room.
Ground work @ Washington Street Park
- Prune all trees at North Helena Park and Washington Street Park(Via Street department)
- Repairs to bathrooms in all parks
- Order pool tables and table tennis for game room
- Bids for repairs on cart shed
- Order playground equipment from A&P funds
- Bids for air rating golf course
- Repairs to Washington St. bathrooms
- Repairs to 10th street bathrooms
- Tuesday Youth Boys basketball games starts at 5:30pm-8:30pm
- Repairs to A/C on house @ Golf Course
- Repairs to lighting on 10th street and Washington St.
- New play ground equipment in all parks
- Replace basketball goals @ N. Helena, Washington St., Catholic Holler
- Repair baseball field @ 10th street park
- Storage space for equipment
- Repairs to pump house @ N. Helena
- Running water in all parks
- Improve fencing around pool
- Re-surface Greens at golf course
- Repair clock at HWHCC
- Order swing approved by A&P
- Repair goals in Holler
- Clean ditch in North Helena Park
- Clean-up piles of debris in North Helena Park
- Fix the trimming on backboards at HWHCC
- Install Foul Poles at Little League Field
- Replace urinal in boys restroom@ HWHCC
Staff Issues/Concerns
None at this time
District Court Weekly DHR (5-26-09)
WEEKLY DEPARTMENT REPORT
(Period of May 15 - 21, 2009)
Department: Helena-West Helena District Court
Date: May 26, 2009
Prepared by: Linda Danley
SPECIFIC WEEKLY ACTIVITIES:
May 15 - 21, 2009 - Processed civil and small claims actions as received; input traffic violations and criminal actions into court database in preparation for arraignment; and prepared scheduled traffic violations and criminal actions for bench trial.
Fri., May 15, 2009 (9:00 A.M.) - Plea/Arraignment & Review Docket
Total number of cases scheduled – 218
Wed., May 20, 2009 (9:00 A.M.) – Civil & Small Claims Trial
Total number of cases scheduled – 8 civil actions; 1 small claims
Thurs., May 21, 2009 (9:00 A.M.) - Bench Trials on Traffic Violations
Total number of cases scheduled - 49
Thurs., May 21, 2009 (1:30 P.M.) – Bench Trials on Criminal Actions
Total number of cases scheduled - 49
---------------------------------------------------------------
Breakdown of Traffic and Criminal Actions
Resolved during the period of May 15 - 21, 2009
Jurisdiction: City of Helena-West Helena
Finding | Criminal | DWI | Juvenile | Traffic | Total |
BF | 1 | 1 | |||
DM | 8 | 8 | |||
G | 27 | 3 | 4 | 48 | 82 |
NP | 7 | 11 | 18 | ||
TOTAL | 42 | 3 | 4 | 60 | 109 |
Jurisdiction: Phillips County
Finding | Criminal | Traffic | Total |
BF | 1 | 1 | |
DM | 1 | 1 | |
G | 1 | 7 | 8 |
NP | 6 | 7 | 13 |
WR | 1 | 1 | |
TOTAL | 9 | 15 | 24 |
ALL JURISDICTIONS
Finding | Criminal | DWI | Juvenile | Traffic | Total |
BF | 2 | 2 | |||
DM | 9 | 9 | |||
G | 28 | 3 | 4 | 55 | 90 |
NP | 13 | 18 | 31 | ||
WR | 1 | 1 | |||
TOTAL | 51 | 3 | 4 | 75 | 133 |
KEY:
BF – Bond Forfeit NP – Nolle Prosequi
DM – Dismissed WR – Warrant Recalled
G - Guilty
-------------------------------------------------------------------------
Jail Roster
(May 15 - 21, 2009)
Defendant | Docket # | Arrest Date | Release/ Sent. Date | Disposition |
Burns, Aron Jr. | CR-08-4839 CR-08-4840 | 05/12/09 | Plea of not guilty. Trial set for 6/04/09. | |
Carter, Macon | CR-08-3782 CR-08-3988 TR-09-750 TR-09-751 CR-09-844 CR-09-845 | Served while in jail on other charges. | 05/15/09 | Plea of guilty to all charges. Ordered to pay fines+cost totaling $1515.00, sentenced to 90 days in jail, and driver's license suspended for 6 months. |
Henderson, Alvin | TR-09-2018 TR-09-2019 CR-07-2774 CR-07-2775 | 05/10/09 | Plea of guilty to TR-07-2018 and CR-07-2774. Ordered to pay fines+cost totaling $485.00. CR-07-2775 merged with CR-07-2774.
Plea of not guilty to TR-09-2019. Trial set on 6/25/09. | |
Roberson, Leon | CR-07-2618 CR-07-2619 CR-07-2666 CR-07-2667 | 05/14/09 | 05/15/09 | Plea of not guilty. Arranged bond. Set for trial on 07/02/09. |
-------------------------------------------------------------------------
FUTURE WEEKLY ACTIVITIES:
• Fri., May 22, 2009 (9:00 a.m.) - Plea/Arraignment
• Mon., May 25, 2009 – Office Closed – Memorial Day
• Thurs., May 28, 2009 (9:00 a.m.) - Bench Trials on Traffic Violations
• Thurs., May 28, 2009 (1:30 p.m.) - Bench Trials on Criminal Actions
• Fri., May 29, 2009 (9:00 a.m.) - Plea/Arraignment
• Wed., June 3, 2009 – Civil & Small Claims Trials
• Thurs., June 4, 2009 (9:00 a.m.) - Bench Trials on Traffic Violations
• Thurs., June 4, 2009 (1:30 p.m.) - Bench Trials on Criminal Actions
• Fri., June 5, 2009 (9:00 a.m.) - Plea/Arraignment
• Thurs., June 11, 2009 (9:00 a.m.) - Bench Trials on Traffic Violations
• Thurs., June 11, 2009 (1:30 p.m.) - Bench Trials on Criminal Actions
• Fri., June 12, 2009 (9:00 a.m.) - Plea/Arraignment
• Wed., June 17, 2009 – Civil & Small Claims Trials
• Thurs., June 18, 2009 (9:00 a.m.) - Bench Trials on Traffic Violations
• Thurs., June 18, 2009 (1:30 p.m.) - Bench Trials on Criminal Actions
• Fri., June 19, 2009 (9:00 a.m.) - Plea/Arraignment
FOLLOW-UP ACTIVITIES:
• Enter dispositions into court database of cases brought before the court on May 22, 2009 (Plea Day) until completed.
• Process civil and small claims actions as they are received.
• Input new citations and criminal actions as they are received from the Records Department into database in preparation for court.
• Prepare pending actions for trial.
STAFF CONCERNS/ISSUES:
• Training of dispatch personnel on use of Virtual Justice (court software).
• Have computer technician determine source of recent problems with computer system/networking and install virus protection. (Virus protection expired.)


