East Water Weekly Report 2/08/2010

Weekly Department Report
Date: 2/05/2010
Prepared by: Terry McGinister

Specific Weekly Activities 1/29/10 -2/04/10

Checked lift stations
Repaired suction valve at lift station #4 pump #1
Changed out chemicals at the plant
Repaired 6" inch water main on Woodland and Terrace Drive
Repaired 1" inch chlorine charge line at the plant
Monthly meter reading
Worked on plant filter valve
Checked chlorine booster stations
Unstopped sewer on Helendale, Oakland, and Cherry, York Street

Future Weekly Activities
Install pump #2 at lift station #3

Follow up Activities
Finish putting rip rap on levees at the ponds, finish installing by pass hook up at the remaining lift stations.

Staff Concerns/Issues